Fisher Avenue, Vaucluse

New drainage infrastructure and a new gross pollutant trap (GPT) has been constructed for Fisher Ave, Vaucluse to direct overland flow to Rakes Gully and reduce the flow of water traveling down the Avenue causing local flooding to a number of residences.  The new Gross Pollutant Trap will collect leaves and sediment from entering Rakes Gully which was restored by Council in 2003.

Works included the construction of new 600mm diameter concrete pipes and stormwater pits, as well as a gross pollution trap.

This project was completed on 21 November 2008.